A Non-Operable
Thirty Year Old Cleveland Boiler Control System
Addition of a second fuel with a new burner and upgrade of a non-operable 30 year old Cleveland system
A perfect fit for any application
Old is new again
Operating personnel love it
You'll love it too - it takes the guess work out of running your boiler
Our BoilerTEK™ replacement for a non-operable thirty year old Cleveland Boiler Control System has the following features:
- Our pre-engineered system replaces all of the features of the existing system plus many more such as:
- Color touch screen display
- First out annunciator with all limits displayed
- History of the last ten trips
- Count down timers for purge, pilot, and main flame
- Full input, output, and sequence displayed
- Full alarming with history and time stamp
- Multiple trends
- Standard M/A displays with multi speed manual and setpoint adjustment or keypad entry
- Run time hours display
- Complete preassembled sub-panel simply replaces the existing sub-panel.
- Easy to follow NFPA79 guided drawings supplied with each system.
- Dual level password protected access for initial system setup and on line fuel/air ratio curve setting and tuning.
- The BoilerTEK™ system is designed to be installed by your electrician and commissioned by your I&C Technician or Boiler Technician.
- The BoilerTEK™ system can optionally be supplied with the communications of your choice such as; MODBUS, LON, OPC, etc.
The BoilerTEK™ solution for this upgrade uses the latest technology with the capabilities of a full sized DCS system for the price of an off the shelf programmer. AND OUR PLC COMES WITH A THREE YEAR WARRANTY!